“How much detail?” in a BIM model is answered by LOD, short for Level of Development. It describes how detailed an element’s geometry is and how reliable its information is. A wrong LOD costs in both directions: too much detail eats time and file size, too little leaves uncertainty to be solved on site.
The levels in short
- LOD 100: volume and area. For feasibility and early decisions.
- LOD 200: generic elements at approximate size and location. For early coordination.
- LOD 300: precise size, shape and location. For construction documents and tender.
- LOD 350: connections to other systems and supports. For cross-discipline clash detection.
- LOD 400: fabrication and assembly detail. For shop drawings.
- LOD 500: field-verified condition. For facility management and as-built.
How to choose
Write down first what the model is for: a visual presentation, quantities, clash detection, fabrication? Each needs different information. Quantities need defined wall layers (around LOD 300); clash detection also needs pipe hangers and connections in the model (LOD 350).
Not every element must sit at the same level
In practice a model is built at mixed levels: the structure may be LOD 300 while furniture is LOD 200. What matters is to write down in a table, at the start, which element is at which level. That model element table is part of a good BIM execution plan.
A note on LOD 500 and LOIN
In the AIA definition LOD 500 is a field-verified representation; the BIMForum specification defines only 100–400. In Europe, EN 17412-1 describes a “level of information need” (LOIN) that treats geometry and information separately. On an international project, settle early which framework applies.